• Welcome to MacanEVowners! If you're joining us from Taycanforum.com, then you may already have an account here.

    If you were registered on Taycanforum as of January 24, 2024 or earlier, then you can simply login here with the same username and password

    If you wish, you can remove your account here.
Sponsored

Macan EC Model Year 2026 and Leipzig factory closure

CHP

Member
First Name
Christian
Joined
May 20, 2025
Threads
1
Messages
6
Reaction score
6
Location
London UK
Vehicles
MACAN 4S (returned to Porsche)
Country flag
Hi,

I know this topic has been touched briefly in other threads but wonder if anyone does have any information regarding Model Year 2026 start and Leipzig factory closure. According to Porsche app, my build starts on 13th of July and starts leaving factory on 11th of August. 1 month to build seems strange.

Thx

Chris
Sponsored

 

Fly4ever

Macan 4S
Well-Known Member
First Name
Nick
Joined
Oct 14, 2024
Threads
13
Messages
162
Reaction score
134
Location
Greece
Vehicles
Ford Kuga 2.5T (Stage 1 tuned @240PS),Macan 4S ordered
Country flag
I think the OP means the August pause due to vacation and production line servicing rather than a complete factory closing.Maybe I'm wrong though...
Concerning the building time needed for the car to be produced,as far as I know a heavy spec'ed loaded car needs approx 3 weeks to exit the factory from day 1 to completion including all necessary software installations and concequent testing prior entering the delivery phase to the dealership.
As for MY2026 according to my knowledge will start from September 01.
 

Petzi

Macan Turbo
Well-Known Member
First Name
peter
Joined
Dec 23, 2024
Threads
6
Messages
228
Reaction score
164
Location
Austria
Vehicles
Macan Turbo EV, 911 limited, Mustang V8 1967, GMC Gran Sierra 1971, Smart Brabus
Country flag
Sorry, my mistake. Meant just for holidays.
do not think they go on holidays either. they work 24/7 in three shifts.
 


OP
OP

CHP

Member
First Name
Christian
Joined
May 20, 2025
Threads
1
Messages
6
Reaction score
6
Location
London UK
Vehicles
MACAN 4S (returned to Porsche)
Country flag
I think the OP means the August pause due to vacation and production line servicing rather than a complete factory closing.Maybe I'm wrong though...
Concerning the building time needed for the car to be produced,as far as I know a heavy spec'ed loaded car needs approx 3 weeks to exit the factory from day 1 to completion including all necessary software installations and concequent testing prior entering the delivery phase to the dealership.
As for MY2026 according to my knowledge will start from September 01.
Thank you, car is fairly spect. Also delay occurred once I optioned for club leather. Original build scheduled for June with delivery July/August. Thanks for clarifying on factory holidays, yes, that’s what I meant. Hope they get the car right this time, first one was a lemon. Just don’t want car be build by those mentally already on holidays and finished by those still on holidays;-)
 

Diego

Macan 4
Well-Known Member
First Name
Diego
Joined
May 12, 2024
Threads
18
Messages
680
Reaction score
1,107
Location
Italy
Vehicles
Macan 4
Country flag
Mine was built in august (delivered in September) in less than 1 month (at Leipzig) and it was one of the first Macan EV built so now it can only be faster. 22K kms done with zero issues.
 

Fly4ever

Macan 4S
Well-Known Member
First Name
Nick
Joined
Oct 14, 2024
Threads
13
Messages
162
Reaction score
134
Location
Greece
Vehicles
Ford Kuga 2.5T (Stage 1 tuned @240PS),Macan 4S ordered
Country flag
do not think they go on holidays either. they work 24/7 in three shifts.
According to my SA and adding to my previous knowledge from in here August is the month most of the employees have their vacation and the plant in general even though continues their works it's under a "shlower than usual" mode.It's also the month Porsche chooses for servicing the production equipment.Full production capacity is resumed from 31/08 onwards.
 

Fly4ever

Macan 4S
Well-Known Member
First Name
Nick
Joined
Oct 14, 2024
Threads
13
Messages
162
Reaction score
134
Location
Greece
Vehicles
Ford Kuga 2.5T (Stage 1 tuned @240PS),Macan 4S ordered
Country flag
Just don’t want car be build by those mentally already on holidays and finished by those still on holidays;-)
Exactly that was the reason to ask for a late allocation so my production date is within 1st week of September and delivery one month later.
The second reason was I didn't mind waiting a little longer as I prefer to get a MY2026 car delivered with the new software being available from September 01 installed directly by the factory rather than the dealership.
 


Brake

Macan Turbo
Member
Joined
Apr 16, 2025
Threads
0
Messages
6
Reaction score
7
Location
NL
Vehicles
Audi e-tron 55 sportback S edition
Country flag
PC told me my2026 slots are still not available.
 
OP
OP

CHP

Member
First Name
Christian
Joined
May 20, 2025
Threads
1
Messages
6
Reaction score
6
Location
London UK
Vehicles
MACAN 4S (returned to Porsche)
Country flag
Exactly that was the reason to ask for a late allocation so my production date is within 1st week of September and delivery one month later.
The second reason was I didn't mind waiting a little longer as I prefer to get a MY2026 car delivered with the new software being available from September 01 installed directly by the factory rather than the dealership.
How did you manage? I asked my dealer in UK, he doesn't know how to arrange for Model Year 2026.
 

Fly4ever

Macan 4S
Well-Known Member
First Name
Nick
Joined
Oct 14, 2024
Threads
13
Messages
162
Reaction score
134
Location
Greece
Vehicles
Ford Kuga 2.5T (Stage 1 tuned @240PS),Macan 4S ordered
Country flag
PC told me my2026 slots are still not available.
I remember some time along the way my SA told me that especially the Macan unlike the rest Porsche models will not change its MY on September but rather from November onwards but I doubted him giving more credit to the information I got in here from our community. Maybe it's true after all however it was completely impossible to have the car delivered beyond late October/early November as I'll be away for winter untill 15-20 January 2026.
 

Fly4ever

Macan 4S
Well-Known Member
First Name
Nick
Joined
Oct 14, 2024
Threads
13
Messages
162
Reaction score
134
Location
Greece
Vehicles
Ford Kuga 2.5T (Stage 1 tuned @240PS),Macan 4S ordered
Country flag
How did you manage? I asked my dealer in UK, he doesn't know how to arrange for Model Year 2026.
He rold me he would try applying for an allocation as late as possible but according to my above post most likely he finally didn't manage to succeed.
 

distreal

Macan 4S
New Member
Joined
Mar 30, 2025
Threads
0
Messages
3
Reaction score
3
Location
Poland
Vehicles
Macan 4S, Tesla Model 3
Country flag
Hi,

I know this topic has been touched briefly in other threads but wonder if anyone does have any information regarding Model Year 2026 start and Leipzig factory closure. According to Porsche app, my build starts on 13th of July and starts leaving factory on 11th of August. 1 month to build seems strange.

Thx

Chris
It’s actually normal. The start time refers to the entire batch, so it doesn’t necessarily mean your build will begin on the 13th of July. However, they’ll likely confirm that they have all the necessary parts for your build by that date. I’m pretty sure the end date refers to the estimated delivery date, not that your dealer would want to confirm that 😄
Sponsored

 
 







Top